BRU 5.49% 8.6¢ buru energy limited

Ann: Operations Update, page-2

  1. 5,161 Posts.
    lightbulb Created with Sketch. 586
    The Joint Venture has agreed that the first well in the drilling program will be Ungani 6 with the design of the well currently under detailed review. The well will be drilled in either a high angle deviated or a horizontal configuration from an already cleared location beside the Ungani Production Facility. The second well in the program has been agreed by the joint venture as a wildcat exploration well on the regionally significant Yakka Munga structure. Yakka Munga 1 will be drilled to a total depth of some 2,100 metres with its principal objectives being the Reeves Formation sandstones which are oil bearing in the Ungani Far West 1 well. The Reeves Formation is an emerging play in the Canning Basin and the Reeves section in the Yakka Munga 1 well is 2 Contact us T +61 8 9215 1800 | E [email protected] | PO Box 1903, West Perth WA 6872 | ABN 71 130 651 437 prognosed to be over 700 metres thick, with a substantial part of the section never previously penetrated in the Basin. The well following Yakka Munga 1 is still subject to joint venture agreement and the results of Ungani 6, but is planned to be the Ungani 7 production well. The configuration of this well is also subject to further analysis, and review of the results from the Ungani 6 well.

    C'mon YM!
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
8.6¢
Change
-0.005(5.49%)
Mkt cap ! $57.73M
Open High Low Value Volume
8.9¢ 8.9¢ 8.6¢ $16.81K 191.2K

Buyers (Bids)

No. Vol. Price($)
1 254 8.6¢
 

Sellers (Offers)

Price($) Vol. No.
8.9¢ 225741 1
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
8.7¢
  Change
-0.005 ( 3.01 %)
Open High Low Volume
8.7¢ 8.7¢ 8.6¢ 16424
Last updated 15.32pm 14/06/2024 ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.