BRU 1.16% 8.5¢ buru energy limited

Ann: Operations Update, page-3

  1. 5,180 Posts.
    lightbulb Created with Sketch. 589
    Current production from the Ungani Field is UP to some 1,700 bopd following the completion and tie in of the Ungani 7H well. The next available ship for the lifting of oil from the Wyndham storage tank is scheduled for late December, and field production is being controlled to ensure that tank tops are not reached before the arrival of the ship.
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.