The good news can be seen the photo on the last page.
The Williamson cutback looks to be complete. They are now grade controlling a 60m wide orebody at the base of the pit. The reserves over this pit are 1Mt @ 1.6g/t.
Williamson will provide the base load feed for the next 6mths to ensure the expanded mill is full. Recent Golden Age drilling success should provide grade profile. I'm expecting record production for the Dec20 half.
- Forums
- ASX - By Stock
- WMC
- Ann: Operations Update
Ann: Operations Update, page-23
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)