Is "basement" defined by interpretation of geology or the maximum drill depth that the rig is capable of. If the drill rig can in fact go to 1000m depth, then what is the marginal extra cost/drill time of drilling for every 100m? What was the decision that caused drilling to be atopped at 563m depth for Cracker-1S? Is that the maximum they could have drilled to based on the rig?
- Forums
- ASX - By Stock
- EXR
- Ann: Operations Update
Ann: Operations Update, page-141
-
-
- There are more pages in this discussion • 360 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
-0.003(4.55%) |
Mkt cap ! $75.39M |
Open | High | Low | Value | Volume |
6.6¢ | 6.7¢ | 6.3¢ | $400.6K | 6.293M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 24194 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 120977 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 2561725 | 0.062 |
9 | 1938310 | 0.061 |
26 | 1656581 | 0.060 |
4 | 520860 | 0.059 |
5 | 204209 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 120977 | 4 |
0.065 | 467460 | 2 |
0.066 | 699511 | 2 |
0.067 | 15151 | 1 |
0.068 | 204400 | 2 |
Last trade - 15.59pm 18/10/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |