I would like to question point 1, in the last 6 months we have mined considerably more ore than has been processed. While building these stockpiles we have not been able to raise the grade to where it needs to be. If we had the FS grades we wouldnt be entertaining these JV satellites.
- Forums
- ASX - By Stock
- Ann: Opportunity for significant near-term production increase
I would like to question point 1, in the last 6 months we have...
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online