AVL 0.00% 1.6¢ australian vanadium limited

Lab test work on the feasibility of recovering >62%fe is being...

  1. 2,514 Posts.
    lightbulb Created with Sketch. 428
    Lab test work on the feasibility of recovering >62%fe is being done at present.
    Btw ..looking at FEX transport costs, 490 km from Iron Ridge to Geraldton using triple road trains. It is a JV with the transport Co at a cost of $1.25m.
    Employing 70 drivers and 30 workers in Geraldton at a cost of $43.27 p/t for 1.25mtpa.

    IMO ..if the **by fe is not able to be upgraded and recovered efficiently it makes the move to Mullewa a bit more difficult.
 
watchlist Created with Sketch. Add AVL (ASX) to my watchlist
(20min delay)
Last
1.6¢
Change
0.000(0.00%)
Mkt cap ! $142.1M
Open High Low Value Volume
1.7¢ 1.7¢ 1.6¢ $44.5K 2.638M

Buyers (Bids)

No. Vol. Price($)
71 24658179 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 10792443 39
View Market Depth
Last trade - 12.59pm 25/07/2024 (20 minute delay) ?
AVL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.