Olaroz has a measured and indicated resource of 6.4Mt so at 35,000 tpa that would be 183 years, but there probably will be a stage 3 after stage 2 and Cauchari brine (6.5 Mt - measured, indicated and inferred resource) may be processed at Olaroz. Whatever the project life is, I don't think we'll be around!
The presentation says that Sal de Vida has a project life of 44 years and James Bay has a mine life of 18 years.
Mt Cattlin I have no idea. I recall seeing on a GXY thread that maybe it's not a very long project life. Tellingly the presentation doesn't say, so maybe it isn't much.
ORE Price at posting:
$7.69 Sentiment: Buy Disclosure: Held