Great increase , should be interesting few months.
Increased Tonnage • 50% increase in the Total Mineral Resource Estimate to 18.86Mt from 12.54Mt (2018) o 78% increase in the Measured and Indicated Mineral Resource Estimate to 16.21Mt from 9.34Mt (2018) ▪ 1,200% increase to the Measured Mineral Resource Estimate to 4.30Mt from 0.33Mt (2018) ▪ 37% increase to Indicated Mineral Resource Estimate to 12.33Mt from 9.01Mt (2018) o 30% reduction to Inferred Mineral Resource Estimate to 2.24Mt from 3.20Mt (2018), due to upgrade • 25% increase to the Measured and Indicated contained metal tonnes to 63.9kt from 50.8kt (2018)
- Forums
- ASX - By Stock
- ELT
- Ann: Oropesa Tin Project - Mineral Resource Estimate
Ann: Oropesa Tin Project - Mineral Resource Estimate, page-2
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELT (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
-0.005(4.17%) |
Mkt cap ! $22.39M |
Open | High | Low | Value | Volume |
11.5¢ | 11.5¢ | 11.5¢ | $24.25K | 210.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 50233 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 156075 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 50233 | 0.115 |
4 | 62858 | 0.110 |
2 | 101100 | 0.105 |
1 | 100000 | 0.100 |
1 | 10500 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 156075 | 1 |
0.125 | 76211 | 1 |
0.130 | 103987 | 2 |
0.135 | 59000 | 2 |
0.150 | 55000 | 3 |
Last trade - 13.03pm 22/07/2024 (20 minute delay) ? |
Featured News
ELT (ASX) Chart |