jasonp,
No I have used the 2P contingent resources for the well in question F5 D5 ST, being 270,000 bbl and 0.86 bcf.
Boysy, I am not sure what F3 has to do with it.
I'm estimated total cash generated.
My SM71 production cost are probably too high (could be sub-$5?).
Too many share 4.8b v 5.0b as boysy points out.
Whilst I don't know production profile, and it is likely to be front ended I believe that I was overly generous to make up for too many shares and too high production costs.
I believe that my guesstimates would be fairly close, or at least close enough to make an informed decision..
- Forums
- ASX - By Stock
- OEL
- Ann: Otto to Participate in Production Acceleration Well at SM71
Ann: Otto to Participate in Production Acceleration Well at SM71, page-13
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $62.33M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.3¢ | $975 | 75K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 12486048 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 15035860 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 12486048 | 0.012 |
8 | 4907271 | 0.011 |
7 | 14275452 | 0.010 |
2 | 1375122 | 0.008 |
2 | 166837 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 15035860 | 17 |
0.014 | 5358893 | 11 |
0.015 | 4956622 | 7 |
0.016 | 2000000 | 1 |
0.017 | 72000 | 1 |
Last trade - 10.26am 04/10/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |