TON 0.00% 1.1¢ triton minerals ltd

Ann. out - Exception high grade intersection, page-65

  1. 298 Posts.
    lightbulb Created with Sketch. 38
    Completely wrong. Reporting of mineral resources is totally different to reporting of drill results and cut-offs mean totally different things. SYR didn't use cut-offs for reporting drill results. Drill results, and I mean all of them, are used to estimate the average grades of blocks. Put simply, contiguous blocks are assembled until you reach zones with blocks near the cut-off grade. The cut-offs for the high grade zones are more than 13% but the TGC for the whole of the zones (assembled blocks) is more. Within the resources there are blocks with low TGC and high TGC. Using cut-offs for resource estimation is conservative and a high cut-off is a very impressive. The opposite applies to using cut-offs for reporting of drill results. However, I still think there could be substantial upside once more is known about the northern prospects. TON should be able to build up to a fairly high production using many smaller pits if the northern prospects are at least as good as the southern
 
watchlist Created with Sketch. Add TON (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
0.000(0.00%)
Mkt cap ! $17.25M
Open High Low Value Volume
1.0¢ 1.1¢ 1.0¢ $6.793K 679.1K

Buyers (Bids)

No. Vol. Price($)
5 1352644 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 22784 1
View Market Depth
Last trade - 15.43pm 10/07/2024 (20 minute delay) ?
TON (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.