Completely wrong. Reporting of mineral resources is totally different to reporting of drill results and cut-offs mean totally different things. SYR didn't use cut-offs for reporting drill results. Drill results, and I mean all of them, are used to estimate the average grades of blocks. Put simply, contiguous blocks are assembled until you reach zones with blocks near the cut-off grade. The cut-offs for the high grade zones are more than 13% but the TGC for the whole of the zones (assembled blocks) is more. Within the resources there are blocks with low TGC and high TGC. Using cut-offs for resource estimation is conservative and a high cut-off is a very impressive. The opposite applies to using cut-offs for reporting of drill results. However, I still think there could be substantial upside once more is known about the northern prospects. TON should be able to build up to a fairly high production using many smaller pits if the northern prospects are at least as good as the southern
- Forums
- ASX - By Stock
- TON
- Ann. out - Exception high grade intersection
Ann. out - Exception high grade intersection, page-65
Featured News
Add TON (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.11M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 0.9¢ | $82 | 8.684K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 931254 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 370945 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 931254 | 0.009 |
11 | 2603061 | 0.008 |
4 | 1977619 | 0.007 |
5 | 931975 | 0.006 |
2 | 899995 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 370945 | 4 |
0.011 | 1646722 | 7 |
0.012 | 1866888 | 3 |
0.013 | 500000 | 1 |
0.014 | 299399 | 1 |
Last trade - 15.59pm 15/11/2024 (20 minute delay) ? |
Featured News
TON (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online