This test work just completed has yielded excellent results,...

  1. 114 Posts.
    This test work just completed has yielded excellent results, with metallisation degrees of between 65-87%
    being achieved

    Salient points of this test programme are as follows.
    • The 80mm CFB test plant was operated for three days in order to test the reduction behaviour of the
    titanoferrous concentrate under different reduction conditions and continuous operation.
    • At a solid retention time of 20 minutes, metallisation degrees of 65, 67, 77 and 87% were obtained for
    reduction temperatures of 950, 960, 980 and 995 degrees centigrade respectively.
    • The 80mm CFB plant displayed very stable running conditions and the reactor walls and the cyclone
    were found free of accretions or blockages after each day of operation.
    The test work programme is continuing, with the pre-reduced samples now currently undergoing batch smelting
    tests in Finland. This would separate the products into pig iron and titanium slag.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.