"MBM 008 intersected coal at a depth of 59.9m with a seam thickness of 43.6m Vs predicted thickness of 32m."
That is over 35% increase. The resource is shaping up to be much larger than the upper estimate of 2 billion tonnes. It could even be nudging 3bt if the drilling continues to surprise to the up side.
Yes the final hole is planned to be completed by mid March, then they should have the info required to JORC.
Mt Mulligan also set down for March, should be a few big weeks and months coming up for Mantle holders.
Add to My Watchlist
What is My Watchlist?