tts1980 -
"Ann out.. is 50 barrel/day good or bad for #1? What was the figure before?"
Only way possible to gain some light on your question is by referring back to some other anns, they may give a little insight
Unfortunately the important parts of these anns were in caps and I'm not retyping
these anns released in DEC 2011 (no not a misprint, 2011)
==================================
PERMIAN BASIN PROJECT UPDATE
·
6H WELL IS HAVING PERMANENT PRODUCTION EQUIPMENT INSTALLED.
·
8A WELL SUCCESSFULLY COMPLETED HYDRAULIC FRACTURING. CURRENTLY UNLOADING INITIAL FRAC FLUID AT 28 BARREL PER HOUR RATE.
·
9M WELL IS DRILLING AHEAD AT 8,240 FEET WITH ANOTHER 1,200 FEET TO REACH TOTAL DEPTH.
·
9E WELL LOCATION READIED FOR DRILLING TO START THIS WEEK
==================================
PERMIAN BASIN PROJECT UPDATE
6H WELL HAS PERMANENT PRODUCTION EQUIPMENT INSTALLED. WAITING ON GAS PIPELINE CONSTRUCTION
8A WELL SUCCESSFULLY COMPLETED HYDRAULIC FRACTURING. PRODUCTION EQUIPMENT BEING INSTALLED. OIL REPORTED TO SURFACE DURING FRAC FLUID RECOVERY
9M WELL WAS SUCCESSFULLY COMPLETED TO A DEPTH OF 9,454 FEET. PREPARATIONS UNDER WAY FOR FRACTURE STIMULATION
SCHEDULED FOR THE SECOND WEEK OF JANUARY
9E WELL HAS COMMENCED DRILLING OPERATIONS AND IS DRILLING AHEAD AT 2,992 FEET.
A NEW INTERVAL WILL BE TESTED IN THIS UP DIP WELL
- Forums
- ASX - By Stock
- GGP
- ann out
ann out, page-11
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)