COMMENTARY The Coopers well is shut in for installation of a rod pump. T he Bootleg 4 - 14 - 15TFH well was drilled to the kick off point at 10 ,862 feet and is presently drilling the curve at 11,224 feet MD (measured depth) . When the curve is landed in the Three Forks, 7 inch casing will be set and lateral drilling will follow. As advised previously the Bootleg 5 - 14 - 15TFH well has been drilled to a measured depth of 11,675 feet and 7 inch casing landed and set in the Three Forks. Hydraulic fracture stimulation ope rat ions are planned to start on both Matilda Bay wells on May 20t h.
Add to My Watchlist
What is My Watchlist?