RPT redport limited

ann. out

  1. 283 Posts.
    Suite 8, 24 Leura Street, Nedlands, WA 6009, Australia • Tel: +61 8 9386 6767 • Fax: +61 8 9386 6732 • www.redport.com
    ASX RELEASE
    Company Announcements Office
    Australian Stock Exchange Limited
    By: ASX Online
    DRILLING TO COMMENCE AT HERAKLEION PROSPECT IN SOUTH AUSTRALIA:
    “OLYMPIC DAM” STYLE MINERALISATION TO BE INITIAL FOCUS
    Redport Limited (“Redport”) (ASX: RPT) is pleased to advise that the Manager of the Edwards
    Creek Joint Venture (Reedy Lagoon Corporation Limited) has confirmed diamond drilling will
    commence at the Herakleion Prospect, in South Australia, within the coming week.
    The Herakleion Prospect is one of two prominent gravity anomalies located within the 400km2
    Edward Creek project and lies in the South Australian copper province that hosts both the
    Olympic Dam and Prominent Hill deposits (refer Fig 1).
    The diamond drilling program will explore for an Olympic Dam style copper, gold and uranium
    deposit at the project.
    Initially a diamond drill hole 850m in depth, is planned and the rig has the capacity to deepen this to
    1,200m.
    Upon completion of the first diamond drill hole, the JV partners intend to drill a second deep diamond
    drill hole at the project.
    The drill rig is expected to be on-site for at least 20 days from 21 August 2006.
    Redport holds 18% of the Edward Creek Joint Venture.
    Details of the project were announced on 29 March 2006 and are here reproduced.
    Planned Drilling Programme
    A review and interpretation of all past uranium exploration data identifies the Edward Creek
    Project as prospective for uranium mineralisation. Explorers in the 1970s identified uranium at
    the historic Coominaree and Last Chance copper mines that are both within the Project area. At
    the Coominaree Copper Mine, located a couple of kilometres to the south of Herakleion,
    mineralisation is hosted in quartz-goethite-malachite veins, and has produced results of up to
    7.9% copper and associated uranium values of 200ppm and gold up to 0.29 g/t.
    The geophysical interpretation identified eight airborne radiometric uranium anomalies that
    warrant follow-up. Ground follow-up consisting of geological mapping and local differential
    spectrometer radiometric surveys is proposed to coincide with the forthcoming drilling activity.
    The Joint Venture plans to commence diamond drilling at Target Area 1 (TA-1), located 3 km to
    the south of Target Area 2 (TA-2). This programme will consist of an 850m deep diamond drill
    hole that is designed to penetrate the overlying cover and test the basement for copper-golduranium
    mineralisation. A drill intersection of copper bearing iron-rich breccias at any of the
 
watchlist Created with Sketch. Add RPT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.