CXY 0.00% 0.3¢ cougar energy limited

While funding is important it is not the critical issue. If the...

  1. 367 Posts.
    lightbulb Created with Sketch. 1
    While funding is important it is not the critical issue. If the burn contaminates the water table then the project would have to shut down. Kingaroy is under level 7 water restrictions. Kingaroy’s main dam (Bjelke-Petersen) is down to 2% and the back up dam (Boondooma) is down to 11%. Ground water will be very important to the survival of Kingaroy and indeed the entire SE QLD region. A successful UCG project will need to demonstrate that it has the right hydrogeological conditions to prevent contamination of the water table.
 
watchlist Created with Sketch. Add CXY (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.