1. completion of the scoping study which suggests that U mines at Taylor Ranch is economically viable with estimated net cashflow (before capital, depreciation, rights) of US$68m based on U price US$65/lb.
2. 'targeting' the development of a conventional acid leach plant at a cost of US160m capable of producing 2.2m lbs U per annum
3. Acquisition (100%)of Keota U project also in Colorado
However, it is kind of low key and feels a bit strange. I consider the completion of the ss and the acquisition of Keota as major milestones and should therefore be announced with a lot more fanfare. Am I missing something here?
Perhaps a lot of it hangs on the 27 May hearing.
I can't wait to see the full scoping report.
Cheers
BLR Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held