Share
1,191 Posts.
lightbulb Created with Sketch. 4
clock Created with Sketch.
24/11/16
17:43
Share
Originally posted by turville
↑
The resource volumes are not satisfactory - need to be nominated in terms of targets for drilling (remember the Wanguo programme hardly started)
They need ounces up into Measured category and then conversion into Reserves - it is a process that takes time as RVR and the private Auctus Minerals have been focussed on for the last 2 years and which is now paying off very handsomefollowing resources:
Expand
Are the following resources considered in your assessment:
"Polymetallic Resources totalling 7.3Mt @ 8.6% Zn Eq and a Copper Resources totalling 17.7Mt @ 1.2% Cu Eq – both JORC (2004). "