AUG 0.00% 3.9¢ augustus minerals limited

Ann: Outcropping Ironstone Discovered at Ti-Tree Project, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 622 Posts.
    lightbulb Created with Sketch. 47
    Zones of Outcropping Ironstone Discovered Ironstones in the Gascoyne Region already host significant rare earth deposits.

    Highlights • Surface mapping has confirmed several ironstone zones at the Ti-tree project. • Bentley zone has been mapped over a strike length of approximately 400m. Rock chip sample results are pending. • Exploration activities in the field have commenced, concentrating on high priority lithium and rare earth targets, mapping and rock chip sampling. • Drilling to commence immediately once the Aboriginal Heritage survey is completed. Augustus Minerals (ASX: AUG; “Augustus” or the “Company&rdquo is pleased to advise that the first stage of on the ground exploration of the Ti-Tree project has confirmed the presence of ironstone at several localities which could host rare earths (Figures 1 & 2). At the Bentley prospect, ironstones have been discovered and mapped over a zone of approximately 400m. At Mac’s Well ironstone has been confirmed inside a large radiometric anomaly1. Results from rock chip samples are expected over the next few weeks, although physically the rocks look similar to other known ironstones in the region which host rare earths deposits.
    https://hotcopper.com.au/data/attachments/5370/5370298-f0f4a038b3deb409ac261522ffb1b7c6.jpg
 
watchlist Created with Sketch. Add AUG (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
0.000(0.00%)
Mkt cap ! $4.648M
Open High Low Value Volume
3.9¢ 3.9¢ 3.9¢ $1.463K 37.51K

Buyers (Bids)

No. Vol. Price($)
1 60000 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 89498 2
View Market Depth
Last trade - 12.29pm 15/11/2024 (20 minute delay) ?
AUG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.