and infill at 1.34% for same 65m...
consistent down there. Good stuff.
big JORC upgrade by end 2017.
If this doesn't get DKO off a silly $1m EV - what will.
Ann: Outstanding Drill Results from Sepeda Lithium Project, page-5
Add to My Watchlist
What is My Watchlist?