SMI 1.40% $1.09 santana minerals limited

Ann: Outstanding Economics - RAS Scoping Study (First 10 Years), page-5

  1. 33,389 Posts.
    lightbulb Created with Sketch. 1720
    They seem to gloss over the tailing storage facility (TSF) location .
    How close is it to Shepherds creek ? And strange it is above the process plant .
    Personally think there could be some big environmental opposition to a 20 Million tonne capacity TSF (page 53) , even if the tailing prove to be relatively benign .
    And looks like there are native lizards in the project area , how are they going to collect the lizards and take them to a safe place ?
    Nice to see the process plant is to use low cost and likely environmentally friendly hydro electricity .
    mining cost of NZ $4.00 a tonne seems very low compared to Western Australian operations like ASX listed CMM who are considered one the lowest cost operators .
 
watchlist Created with Sketch. Add SMI (ASX) to my watchlist
(20min delay)
Last
$1.09
Change
0.015(1.40%)
Mkt cap ! $223.3M
Open High Low Value Volume
$1.08 $1.12 $1.07 $706.7K 645.4K

Buyers (Bids)

No. Vol. Price($)
1 3439 $1.09
 

Sellers (Offers)

Price($) Vol. No.
$1.11 3576 1
View Market Depth
Last trade - 15.59pm 13/06/2024 (20 minute delay) ?
Last
$1.10
  Change
0.015 ( 2.82 %)
Open High Low Volume
$1.08 $1.12 $1.07 73061
Last updated 15.51pm 13/06/2024 ?
SMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.