ADV 3.70% 13.0¢ ardiden ltd

Ann: Outstanding High Lithium Grades From Root Bay Project-ADV.AX, page-36

  1. 3,833 Posts.
    lightbulb Created with Sketch. 1919
    Other way around, its the samplings and targets needing to be defined before winter. Drilling should not be an issue during the winter apart from heavy periods. Helps having a hard ground surface.

    Think some of you guy's need to do proper research. Only been looking at the HC post (ADV) for a day and there is some ignorance on these threads.
    Better go back to my hole before I get smashed.!!!
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
-0.005(3.70%)
Mkt cap ! $8.127M
Open High Low Value Volume
13.0¢ 13.0¢ 13.0¢ $7.593K 58.40K

Buyers (Bids)

No. Vol. Price($)
2 60287 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
13.5¢ 6976 1
View Market Depth
Last trade - 12.30pm 13/09/2024 (20 minute delay) ?
ADV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.