Not bad.
Just did a simple math.
The current 2mt is based on 4.5km length and 10% SG. Now the length has extended by 800m and SG of sand has increased to 14% average.
So resource should increase to (1+0.8/4.5) * (14%/10%) = 1.64 times of current 2MT LCE.
In order to be M&A, IMO MRE should at least go above 5MT for HMW alone.
One thing I dont quite understand why GLN has spend one year to drill just one hole. I'd expect more aggressive drilling.
- Forums
- ASX - By Stock
- GLN
- Ann: Outstanding Initial Well Test Results at HMW Project
Ann: Outstanding Initial Well Test Results at HMW Project, page-13
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.0¢ |
Change
0.015(5.26%) |
Mkt cap ! $123.9M |
Open | High | Low | Value | Volume |
29.0¢ | 30.5¢ | 29.0¢ | $383.9K | 1.287M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 9997 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 64682 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9997 | 0.300 |
5 | 190751 | 0.295 |
7 | 252761 | 0.290 |
8 | 260443 | 0.285 |
15 | 690120 | 0.280 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 64682 | 2 |
0.310 | 211000 | 3 |
0.315 | 40000 | 2 |
0.320 | 45000 | 2 |
0.325 | 41893 | 2 |
Last trade - 16.10pm 14/05/2024 (20 minute delay) ? |
|
|||||
Last
30.0¢ |
  |
Change
0.015 ( 4.64 %) |
|||
Open | High | Low | Volume | ||
29.5¢ | 30.5¢ | 29.5¢ | 332478 | ||
Last updated 15.59pm 14/05/2024 ? |
Featured News
GLN (ASX) Chart |