Just what the doctor ordered
Highlights:
• 72-hour constant rate testing successfully completed at first Pata Pila pumping
well (PPB-01-21).
‒ Brine sampling confirms high grade resource (Li > 910 mg/L).
‒ Hydraulic testing saw aquifer response showing favourable conditions for
high volume brine production (15 – 20L per second).
• 30-day longer term pumping test started and flowing steadily.
• Porosity test (RBRC) for specific yield on second Pata Pila well core samples
returned positive results (range of 10.1 – 21.0%, mean of 14.1%).
• Pumping tests to be completed on three further wells; a second well at Pata Pila
and two wells at Rana de Sal.
• Testing of first well at Rana de Sal (PBRS-01-21) is imminent.
- Forums
- ASX - By Stock
- GLN
- Ann: Outstanding Initial Well Test Results at HMW Project
Ann: Outstanding Initial Well Test Results at HMW Project, page-2
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
|
|||||
Last
14.5¢ |
Change
-0.005(3.33%) |
Mkt cap ! $70.89M |
Open | High | Low | Value | Volume |
15.0¢ | 15.0¢ | 14.0¢ | $198.3K | 1.356M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 567612 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.5¢ | 6882 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 567612 | 0.140 |
7 | 565249 | 0.135 |
7 | 463000 | 0.130 |
4 | 320950 | 0.125 |
4 | 256000 | 0.120 |
Price($) | Vol. | No. |
---|---|---|
0.145 | 6882 | 1 |
0.150 | 193967 | 5 |
0.155 | 260000 | 4 |
0.160 | 206028 | 11 |
0.165 | 447500 | 8 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |