Just what the doctor ordered
Highlights:
• 72-hour constant rate testing successfully completed at first Pata Pila pumping
well (PPB-01-21).
‒ Brine sampling confirms high grade resource (Li > 910 mg/L).
‒ Hydraulic testing saw aquifer response showing favourable conditions for
high volume brine production (15 – 20L per second).
• 30-day longer term pumping test started and flowing steadily.
• Porosity test (RBRC) for specific yield on second Pata Pila well core samples
returned positive results (range of 10.1 – 21.0%, mean of 14.1%).
• Pumping tests to be completed on three further wells; a second well at Pata Pila
and two wells at Rana de Sal.
• Testing of first well at Rana de Sal (PBRS-01-21) is imminent.
- Forums
- ASX - By Stock
- Ann: Outstanding Initial Well Test Results at HMW Project
Just what the doctor ordered Highlights:• 72-hour constant rate...
-
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.020(15.4%) |
Mkt cap ! $74.05M |
Open | High | Low | Value | Volume |
12.5¢ | 17.5¢ | 11.5¢ | $2.713M | 18.20M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 118000 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.5¢ | 2660 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 118000 | 0.160 |
2 | 130000 | 0.155 |
1 | 20000 | 0.150 |
3 | 58881 | 0.145 |
7 | 141425 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.145 | 2660 | 2 |
0.150 | 14285 | 1 |
0.155 | 954 | 1 |
0.160 | 63631 | 2 |
0.170 | 356000 | 3 |
Last trade - 15.53pm 05/08/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |