A stage 1 IRR of 80%, no pre-stripping and a waste to ore ratio of 0.2 to 1 with stage 1 mine life at 45 years at 2.9% TREO. This includes a 12.5% contingency that may not even be used and pre-production capex is only US40m, meaning post tax NPV to Cape ratio is at 10:1.
I think the nugget is that the Project is "attracting significant offtake interest" and the team are looking to have funding confirmation within the next 3 months.
- Forums
- ASX - By Stock
- LIN
- Ann: Outstanding Kangankunde Stage 1 Feasibility Study Results
Ann: Outstanding Kangankunde Stage 1 Feasibility Study Results, page-3
-
- There are more pages in this discussion • 299 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIN (ASX) to my watchlist
|
|||||
Last
11.0¢ |
Change
-0.005(4.35%) |
Mkt cap ! $126.8M |
Open | High | Low | Value | Volume |
11.0¢ | 11.0¢ | 11.0¢ | $30.51K | 277.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 243414 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 40000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 243414 | 0.110 |
10 | 663951 | 0.105 |
15 | 700325 | 0.100 |
2 | 140404 | 0.099 |
1 | 100000 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 40000 | 1 |
0.120 | 96609 | 3 |
0.125 | 65000 | 1 |
0.130 | 82294 | 3 |
0.135 | 44983 | 1 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
LIN (ASX) Chart |