I looked at the feasibility study , I can not see how the CAPEX on a 1.8mtpa CIL plant comes in at less than $60M , there has to be labour build cost on top of that and should be shown as a CAPEX expense also otherwise it is disingenuously optimistic from an IRR perspective , would be good to see from GRES what their costing would come in at .
the sub $4.20 a BCM cost seems very low compared with what the likes of CAI came up with for their Bulletin satellite pit which was closer to $18.50 a BCM . Especially strange Ore movement cost is the same as waste movement cost per BCM at 4.20 given a smaller excavator is used to excavate ore compared to waste so less efficient so cost should be higher .
The average strip ratio of near 14:1 is not a good look .
Using diesel as a fuel to make power at $0.60 per KWH just shows how uncompetitive the Australian mining industry has become , thought there was a gas pipeline to Laverton .
- Forums
- ASX - By Stock
- MAU
- Ann: Outstanding value demonstrated by PFS at Lady Julie Project
Ann: Outstanding value demonstrated by PFS at Lady Julie Project, page-5
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.12 |
Change
-0.020(1.75%) |
Mkt cap ! $298.7M |
Open | High | Low | Value | Volume |
$1.10 | $1.15 | $1.10 | $457.1K | 413.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6427 | $1.12 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.15 | 4885 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6427 | 1.120 |
3 | 238851 | 1.100 |
3 | 41719 | 1.020 |
1 | 2970 | 1.010 |
1 | 3000 | 1.000 |
Price($) | Vol. | No. |
---|---|---|
1.150 | 4885 | 1 |
1.160 | 5000 | 1 |
1.170 | 805 | 1 |
1.185 | 436 | 1 |
1.195 | 12000 | 1 |
Last trade - 16.10pm 13/11/2024 (20 minute delay) ? |
Featured News
MAU (ASX) Chart |