MAU 1.75% $1.12 magnetic resources nl

Ann: Outstanding value demonstrated by PFS at Lady Julie Project, page-5

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 34,396 Posts.
    lightbulb Created with Sketch. 1947
    I looked at the feasibility study , I can not see how the CAPEX on a 1.8mtpa CIL plant comes in at less than $60M , there has to be labour build cost on top of that and should be shown as a CAPEX expense also otherwise it is disingenuously optimistic from an IRR perspective , would be good to see from GRES what their costing would come in at .
    the sub $4.20 a BCM cost seems very low compared with what the likes of CAI came up with for their Bulletin satellite pit which was closer to $18.50 a BCM . Especially strange Ore movement cost is the same as waste movement cost per BCM at 4.20 given a smaller excavator is used to excavate ore compared to waste so less efficient so cost should be higher .
    The average strip ratio of near 14:1 is not a good look .
    Using diesel as a fuel to make power at $0.60 per KWH just shows how uncompetitive the Australian mining industry has become , thought there was a gas pipeline to Laverton .
    Last edited by plough: 07/03/24
 
watchlist Created with Sketch. Add MAU (ASX) to my watchlist
(20min delay)
Last
$1.12
Change
-0.020(1.75%)
Mkt cap ! $298.7M
Open High Low Value Volume
$1.10 $1.15 $1.10 $457.1K 413.8K

Buyers (Bids)

No. Vol. Price($)
1 6427 $1.12
 

Sellers (Offers)

Price($) Vol. No.
$1.15 4885 1
View Market Depth
Last trade - 16.10pm 13/11/2024 (20 minute delay) ?
MAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.