Ive got a question for those more knowledgable.
Ive had a read of the investor pres that was released last week, is it me or are TMT very vague on detail and timelines?
Most of the pres is about supply and demand of Vanadium with a very small section detailing the development and corporate.
On page 15 what do they mean by Downstream Processing Testwork and how is this different to the metallurical testwork and has there been a date set for infrastructure capex?
TMT Price at posting:
38.5¢ Sentiment: Hold Disclosure: Held