C7A 0.00% 1.2¢ clara resources australia ltd

Ann: Owner Mining Commences at Granville, page-92

  1. 4,416 Posts.
    lightbulb Created with Sketch. 185
    I believe G2 has the capacity to mine 550t/ annum. It does not mean they will produce 550/t per annum!
    G2 currently has 750t with 2 years LOM with further expansion pending.

    Its more like 300–375 t / annum.
 
watchlist Created with Sketch. Add C7A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.