Sounds about right. I'd allow for some plant downtime and shutdowns etc too. Maybe 90% of nameplate, so 495tpa and another 200k for repairs/parts of a plant this size.
14,440 X 495 = 7,147,800
-200
= $6,947,800
Is a pretty conservative estimate. The owner operate, plus AUD weakness and Tin strength goes straight to the bottom line.
We won't really know what they can achieve until they've had a solid qtr of operation with consistent ore grade, but it's looking good on paper
- Forums
- ASX - By Stock
- C7A
- Ann: Owner Mining Commences at Granville
Ann: Owner Mining Commences at Granville, page-94
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add C7A (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.501M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $115 | 11.46K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1713070 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 488766 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1713070 | 0.009 |
3 | 573919 | 0.008 |
4 | 992855 | 0.007 |
4 | 582661 | 0.006 |
2 | 1500000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 488766 | 2 |
0.011 | 740905 | 2 |
0.012 | 1081280 | 4 |
0.013 | 944662 | 2 |
0.015 | 66732 | 1 |
Last trade - 14.30pm 27/09/2024 (20 minute delay) ? |
Featured News
C7A (ASX) Chart |