-9% stings a bit but the potential positives far outweigh the potential negatives here.
Imo the drop is 90% about the delay itself rather than the project update specifics. 3 months is a long time in this macro environment.
- Forums
- ASX - By Stock
- CZI
- Ann: OZL: West Musgrave Pre-Feasibility Study Progress Update
Ann: OZL: West Musgrave Pre-Feasibility Study Progress Update, page-15
-
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)