Basically Zigi what they meant is the delay of the PFS now means that the 50,000m of drilling that has been underway and is now being wrapped up will now have time to be modelled and implemented to produce an update resource and a reserve (based on the close spatial relationship between drill holes). CZI and OZL were not implying more drilling would occur, they just mean the drilling that is being wrapped up now will have time to be incorporated in the resource estimation before the PFS is release in early 2020. Hope this helps![]()
- Forums
- ASX - By Stock
- Ann: OZL: West Musgrave Pre-Feasibility Study Progress Update
Basically Zigi what they meant is the delay of the PFS now means...
-
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CZI (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online