Delay in PFS completion is great considering the huge improvements they are trying to incorporate. We want to move into the DFS stage with a fully baked concept. Better recoveries and power power being key ongoing objectives.
EL
- Forums
- ASX - By Stock
- CZI
- Ann: OZL: West Musgrave Pre-Feasibility Study Progress Update
Ann: OZL: West Musgrave Pre-Feasibility Study Progress Update, page-2
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)