Central Petroleum Limited (“Company” or “Central”as Operator and 100% owner of Palm Valley Gas Field, announces that the Palm Valley 13 (“PV13” well spudded today at 4pm AEST. Ensign Australia Pty Ltd is drilling the well using its Ensign 932 Drilling Rig. The well aims to access the known gas in the Pacoota P1 sandstone, by intersecting the P1 target at a high angle to increase the chances of connecting to naturally occurring fractures. The PV13 program anticipates a 46 day drilling timeline to reach a total depth of 3,476 metres MD (measure depth) with a vertical depth of 2,102 metres TVD (true vertical depth) and a near horizontal (84.9 Degrees) reservoir section of up to 1,040 metres MD.
100%..... I was never one for sharing!!!
- Forums
- ASX - By Stock
- CTP
- Ann: PALM VALLEY 13 SPUDS
CTP
central petroleum limited
Add to My Watchlist
0.00%
!
5.5¢

Ann: PALM VALLEY 13 SPUDS, page-3
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
5.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $40.98M |
Open | High | Low | Value | Volume |
5.4¢ | 5.5¢ | 5.3¢ | $2.456K | 45.65K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 275393 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 127247 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 275393 | 0.053 |
4 | 480000 | 0.052 |
4 | 940000 | 0.051 |
4 | 560000 | 0.050 |
1 | 100000 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 127247 | 1 |
0.058 | 6030 | 1 |
0.059 | 326120 | 2 |
0.060 | 140000 | 1 |
0.067 | 149268 | 1 |
Last trade - 15.58pm 25/07/2025 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online