The shareholders that want it all now are doomed for disappointment and will likely be the ones to sell in frustration the day before a company making announcement
It is healthy to be able to vent frustration every now and then but it won't change anything
ASN and A1 Lithium have just hired a bunch of people and it takes time for them to start having an impact
We can argue the hiring could have started a lot earlier but it took place straight after the CR so it's all about getting your ducks in a row
As for extended timelines, we all feel the frustration but, all good plans are subject to and able to be changed as it suits developments along the way
Now, back to that Green River accommodation search
- Forums
- ASX - By Stock
- ASN
- Ann: Paradox Lithium Plant Front End Engineering & Design Study
Ann: Paradox Lithium Plant Front End Engineering & Design Study, page-110
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $92.77M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $140.8K | 2.096M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 255554 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 115643 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 155555 | 0.067 |
4 | 939410 | 0.066 |
7 | 767516 | 0.065 |
2 | 220000 | 0.064 |
2 | 340000 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 115643 | 3 |
0.070 | 19745 | 1 |
0.071 | 3000 | 1 |
0.072 | 57234 | 2 |
0.073 | 37777 | 2 |
Last trade - 16.10pm 12/11/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online