Taking a prospective view, we have achieved extraordinary progress from a state of potential deprivation to conducting tests that have yielded above-expectation results. In a relatively short period of time, we have also become very close to an offtake agreement and funding, enabling us to generate substantial revenue. The pace of our progress is impressive and highly promising, bearing all the hallmarks of a great success story in the making.
- Forums
- ASX - By Stock
- ASN
- Ann: Paradox Lithium Plant Front End Engineering & Design Study
Ann: Paradox Lithium Plant Front End Engineering & Design Study, page-117
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $92.77M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $140.8K | 2.096M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 255554 | 6.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 115643 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 155555 | 0.067 |
4 | 939410 | 0.066 |
7 | 767516 | 0.065 |
2 | 220000 | 0.064 |
2 | 340000 | 0.063 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 115643 | 3 |
0.070 | 19745 | 1 |
0.071 | 3000 | 1 |
0.072 | 57234 | 2 |
0.073 | 37777 | 2 |
Last trade - 16.10pm 12/11/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online