This part is the one ……
”This work has identified several options for financing which have now been accessed, and the pathway to securing this finance has been determined.”
So sounds to me were about to know a ton more about financing and offtakes very soon.
GLTAHs
Solo.
- Forums
- ASX - By Stock
- ASN
- Ann: Paradox Lithium Plant Front End Engineering & Design Study
Ann: Paradox Lithium Plant Front End Engineering & Design Study, page-25
-
-
- There are more pages in this discussion • 143 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.010(9.52%) |
Mkt cap ! $148.4M |
Open | High | Low | Value | Volume |
10.5¢ | 11.5¢ | 10.5¢ | $243.7K | 2.204M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1031794 | 10.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 290407 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 922794 | 0.105 |
9 | 504990 | 0.100 |
1 | 10090 | 0.099 |
1 | 1 | 0.098 |
1 | 50000 | 0.097 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 281712 | 6 |
0.120 | 720468 | 7 |
0.125 | 432366 | 7 |
0.130 | 142314 | 4 |
0.135 | 892086 | 7 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online