This part is the one ……
”This work has identified several options for financing which have now been accessed, and the pathway to securing this finance has been determined.”
So sounds to me were about to know a ton more about financing and offtakes very soon.
GLTAHs
Solo.
- Forums
- ASX - By Stock
- Ann: Paradox Lithium Plant Front End Engineering & Design Study
This part is the one ……”This work has identified several options...
-
-
- There are more pages in this discussion • 143 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.8¢ |
Change
0.001(1.30%) |
Mkt cap ! $100.7M |
Open | High | Low | Value | Volume |
7.7¢ | 7.9¢ | 7.7¢ | $223.5K | 2.863M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 51589 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 7737 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 51589 | 0.077 |
5 | 290019 | 0.076 |
7 | 529583 | 0.075 |
5 | 224026 | 0.074 |
8 | 497987 | 0.073 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 7737 | 1 |
0.079 | 856766 | 5 |
0.080 | 872434 | 7 |
0.081 | 976780 | 5 |
0.082 | 300000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |