Its an great news but missing timeline will push production in 2026 indeed Li prices skyrocketing.
Its really frustrating what work did they do within these two quarter.
Apart from getting emotional I think SP showing some honesty and for sure who ever have options wish you all the best.
As a result drilling not yet commeced waiting waiting…
- Forums
- ASX - By Stock
- ASN
- Ann: Paradox Lithium Plant Front End Engineering & Design Study
Ann: Paradox Lithium Plant Front End Engineering & Design Study, page-53
-
-
- There are more pages in this discussion • 115 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
|
|||||
Last
10.0¢ |
Change
-0.005(4.76%) |
Mkt cap ! $129.0M |
Open | High | Low | Value | Volume |
11.0¢ | 11.3¢ | 10.0¢ | $196.1K | 1.880M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 670491 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 1031644 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 662391 | 0.100 |
3 | 210090 | 0.099 |
2 | 25001 | 0.098 |
1 | 50000 | 0.097 |
3 | 115220 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 1031644 | 3 |
0.110 | 678863 | 3 |
0.115 | 405324 | 6 |
0.120 | 770468 | 8 |
0.125 | 382366 | 6 |
Last trade - 16.10pm 25/06/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |