ASN 2.11% 9.3¢ anson resources limited

Ann: Paradox Lithium Plant Front End Engineering & Design Study, page-80

  1. 166 Posts.
    lightbulb Created with Sketch. 58
    The reason these timelines are out the window is because of Green River !
    If Bruce had concentrated on Paradox and just the Western strategy then the timeline would have been a lot tighter.
    Just concentrating on the Eastern strategy alone and our 1Mt resource would give us a production life of 50 years @ 20k tons per annum. That's big shit !
    If time was to be spent anywhere else it should have been on Bull. No BULL !
    Adding Green River is just being greedy and time consuming. Let's get what we have already up and going for shareholders sake and forget expanding to big, too soon.
    Seen it all before, companies with too big ambitions, too soon and then bust.
    Not saying ASN will go bust because of what they have, but, come on Bruce baby steps first before you can run.
 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
(20min delay)
Last
9.3¢
Change
-0.002(2.11%)
Mkt cap ! $120.1M
Open High Low Value Volume
9.4¢ 9.4¢ 9.2¢ $97.21K 1.047M

Buyers (Bids)

No. Vol. Price($)
2 75914 9.3¢
 

Sellers (Offers)

Price($) Vol. No.
9.4¢ 31914 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
ASN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.