    Hi marmaduke,

    "Yea, I would encourage everybody to disregard the above post from ozwire.

    I would be bitter too if I had invested in GDY at anything more than 20c, which he most likely did."

    I luckily never did buy any GDY - always waiting, waiting, waiting for the proof of concept. I also contemplated buying PTR and even TEY at one stage. I appreciate that its a bit of a drag for a *downramper* to suddenly pop out of the woodwork like I am, but I have spent a lot of time in the past buying the HDR Geothermal dream, and I am genuinely sad that we have got to this point.

    However I will go further than my earlier post and say that today's announcement is the *OFFICIAL DEATH* of Bertus DeGraaf's dream of deep hot rock geothermal power.

    Why?

    The original GDY dream was to be able to draw 70kg per second (roughly equivalent to 70 litres per second)from a single fractured well. As noted in my long winded email below (from 2009, post # 4057210, to the GDY HC board) the consultants said “Production testing of wells Habanero 2 and Habanero 3 confirmed flow rates of 18 to 27 l/s from the single stimulated layer. If multiple stimulated layers are created the production rate would be several times this amount” and “Well Habanero 1, even though it showed evidence of significant mud damage, has accepted injection rates of 18.5 l/s, which is modest but acceptable.”

    If 18.5 litres per second is modest what is PTR's 1-6 litres per second. It’s a disaster, that what it is- just calling it as I see it! Sorry.

    Here is the post from 2009 about GDY's flow rates:

    From a long term GDY watcher but not in the stock yet....

    I am rather concerned that GDY are in a bit of trouble now. Several years ago the economics was such that a single fracture level was contemplated to make the power generation process viable, and when discovered multiple fracture levels were something of a *bonus*.

    e.g. the following from the 1995 annual report (words: "further enhancing the potential of the project"):

    "Chemical injection in August, 2005 into Habanero #2
    to improve the connectivity before the commencement
    of the short circulation test (the last step of the
    diagnostic phase) eventually led to essentially blocking
    off the connection. It indirectly led to the discovery of
    additional fracture zones higher up in the well, further
    enhancing the potential of the project. The blocked
    Bottom Zone fractures presented an opportunity to
    hydraulically stimulate the Top Zone fractures.
    This resulted in the development of a second reservoir
    (September, 2005), demonstrating that geological
    conditions are favourable for multiple reservoir
    developments, a key to large scale commercialisation
    of the Cooper Basin HFR geothermal resource."

    Now it seems that additional fracture zones are *necessary* for the viability of the project....

    GDY's 'proof of concept' announcement (31 March 2009 to ASX) said:

    "Modelling of wells theoretically located at the extremities of the Habanero stimulated zone showed that the wells would be capable of extracting more than 40 megawatts thermal for over 20 years with only a 5°C temperature
    draw-down for circulation rates higher than 70 kg per second. Circulation rates during closed loop testing between Habanero 1 and 3 reached a maximum of 15.5 kg per
    second from a single stimulated zone. Production rates of 25 kg per second have been achieved from Habanero 3. Although these flow rates have not approached 70 kg per second at this time, the results are an indication of the heat capacity of the reservoir." and...

    "These achievements do not necessarily imply economic viability at this time. Commercial demonstration will, among other things, focus on improving drilling
    performance and well costs and demonstrate the ability to stimulate and circulate through multiple zones in the granite to enhance well productivity and injectivity to
    required levels and to increase the recoverable resource base."

    The important statement that has me most worried is from Geothermex's report on the proof of concept under the heading "Achievement of Adequate Well Productivity and Injectivity" which said:

    "Production testing of wells Habanero 2 and Habanero 3 confirmed flow rates of 18 to 27 l/s from the single stimulated layer. If multiple stimulated layers are created the production rate would be several times this amount. Well Habanero 1, even though it showed evidence of significant mud damage, has accepted injection rates of 18.5 l/s, which is modest but acceptable. But more relevant is the good productivity encountered at well Habanero 3, indicating that comparable injectivity should be achievable provided mud damage is avoided. Therefore assuming the development of multiple stimulated layers, adequate well productivity and injectivity have been demonstrated."

    Now, that last sentence has me VERY worried. Given that GDY's well has blown it's top with only one fracture zone working, and given that there is no proven ability YET to harvest more than one fracture zone at much higher well pressures, and given that it may be that viability *depends* on multiple fractures, there are some issues!!!

    Not least we can't know whether this thing stacks up unless GDY can now demonstrate the ability to manage multiple fracture zones within the the one set of wells- something that has not been done. There may be enough heat flow for a 1kW plant for Innaminka but is there enough for commercial operation????.

    Any others have views? Sorry to be a (hot) wet blanket.





 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$1.36
Change
0.008(0.55%)
Mkt cap ! $3.108B
Open High Low Value Volume
$1.35 $1.37 $1.35 $3.822M 2.830M

Buyers (Bids)

No. Vol. Price($)
62 115054 $1.36
 

Sellers (Offers)

Price($) Vol. No.
$1.37 208343 45
View Market Depth
Last trade - 15.26pm 20/06/2025 (20 minute delay) ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.