Ozwire,sorry, i did not even read your above post after reading...

  1. 2,643 Posts.
    lightbulb Created with Sketch. 385
    Ozwire,
    sorry, i did not even read your above post after reading some of the others before hand but if you refer to the Beach Energy report 5-Oct and the PTR announcement 6-Oct I think it might help explain the considered low rates.

    5-Oct
    Beach Energy release
    Beach Operated Geothermal - Paralana Project, Arrowie Basin
    The Paralana-2 (Beach 21%) geothermal well is currently being flow tested and controlled at approximately 2 barrels per minute to enable slow heating of the wellbore. Flow will be monitored from the well over approximately the next two weeks. Results will be communicated after this period.


    and
    6-Oct
    PTR Release
    Following the mobilization of equipment to the Paralana site, flowing of the well started early on the morning of Monday 3 October 2011. The operation has involved the gradual increasing of temperature and flow to manage the operation within equipment and test design parameters.

    Regards
    SynQuasi
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$1.37
Change
0.010(0.74%)
Mkt cap ! $3.114B
Open High Low Value Volume
$1.35 $1.37 $1.35 $25.22M 18.51M

Buyers (Bids)

No. Vol. Price($)
3 242687 $1.37
 

Sellers (Offers)

Price($) Vol. No.
$1.37 409400 15
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
BPT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.