If the whole of CV5 is +70% recoveries from DMS then PMT truly stands alone. Sigma published their updated DFS with phase 1 65% recoveries, phase 2 57% recoveries, and phase 3 50% recoveries. That's trying to fit the deposit to the plant type - which is the wrong way to do things. Recovering 58% & 50% of Ore is too inefficient.
- Forums
- ASX - By Stock
- Ann: Patriot Achieves 79% Recovery in DMS Test Work
If the whole of CV5 is +70% recoveries from DMS then PMT truly...
-
- There are more pages in this discussion • 260 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add PMT (ASX) to my watchlist
|
|||||
Last
45.5¢ |
Change
-0.045(9.00%) |
Mkt cap ! $283.4M |
Open | High | Low | Value | Volume |
48.0¢ | 48.0¢ | 45.0¢ | $1.121M | 2.418M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 64492 | 45.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
46.0¢ | 29000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 51666 | 0.455 |
9 | 81747 | 0.450 |
4 | 62750 | 0.445 |
2 | 30500 | 0.440 |
4 | 20673 | 0.435 |
Price($) | Vol. | No. |
---|---|---|
0.460 | 29000 | 2 |
0.465 | 19354 | 1 |
0.470 | 40000 | 1 |
0.475 | 54000 | 2 |
0.480 | 40000 | 1 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
PMT (ASX) Chart |