Hmm..a bit of a mixed bag...
The bad news:
- on-site PDF is off the table
- PDF cost is slightly higher than expected
The good news:
The unknowns:
- Final hurdle to license renewal is ticked
- US$50 million is already deposited with the AELB to cover part of the $98m (initial works $10m and construction $34m)
- Balance of payments to Gading ($54m) are spread over 2023-2026 (at the time Lynas 2025 will start)
- Lynas will not have any responsibility/liability for the WLP once it leaves the LAMP
Over to Yeo...
- will Yeo release all of the US$50 million deposited with AELB?
- is Gading also responsible for transport of the WLP from the LAMP to the PDF or is this cost still with Lynas?
- Forums
- ASX - By Stock
- LYC
- Ann: PDF for WLP Residue in Malaysia
Ann: PDF for WLP Residue in Malaysia, page-14
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
|
|||||
Last
$6.07 |
Change
0.020(0.33%) |
Mkt cap ! $5.673B |
Open | High | Low | Value | Volume |
$6.08 | $6.09 | $6.02 | $35.62M | 5.828M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 298927 | $6.06 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.07 | 30108 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 4058 | 6.030 |
1 | 4983 | 6.010 |
9 | 11344 | 6.000 |
1 | 2000 | 5.990 |
2 | 251 | 5.980 |
Price($) | Vol. | No. |
---|---|---|
6.080 | 4607 | 2 |
6.090 | 1506 | 2 |
6.100 | 4240 | 2 |
6.140 | 14560 | 3 |
6.150 | 3985 | 3 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online