Hmm..a bit of a mixed bag...
The bad news:
- on-site PDF is off the table
- PDF cost is slightly higher than expected
The good news:
The unknowns:
- Final hurdle to license renewal is ticked
- US$50 million is already deposited with the AELB to cover part of the $98m (initial works $10m and construction $34m)
- Balance of payments to Gading ($54m) are spread over 2023-2026 (at the time Lynas 2025 will start)
- Lynas will not have any responsibility/liability for the WLP once it leaves the LAMP
Over to Yeo...
- will Yeo release all of the US$50 million deposited with AELB?
- is Gading also responsible for transport of the WLP from the LAMP to the PDF or is this cost still with Lynas?
- Forums
- ASX - By Stock
- Ann: PDF for WLP Residue in Malaysia
Hmm..a bit of a mixed bag... The bad news: on-site PDF is off...
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
|
|||||
Last
$6.22 |
Change
0.070(1.14%) |
Mkt cap ! $5.813B |
Open | High | Low | Value | Volume |
$6.21 | $6.22 | $6.07 | $13.54M | 2.193M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 12000 | $6.20 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.22 | 12273 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 12000 | 6.200 |
3 | 18095 | 6.180 |
1 | 14349 | 6.170 |
3 | 39510 | 6.160 |
1 | 9251 | 6.150 |
Price($) | Vol. | No. |
---|---|---|
6.220 | 8273 | 1 |
6.230 | 19595 | 4 |
6.240 | 14849 | 2 |
6.250 | 18749 | 3 |
6.290 | 1000 | 1 |
Last trade - 16.10pm 29/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |