Hmm..a bit of a mixed bag...
The bad news:
- on-site PDF is off the table
- PDF cost is slightly higher than expected
The good news:
The unknowns:
- Final hurdle to license renewal is ticked
- US$50 million is already deposited with the AELB to cover part of the $98m (initial works $10m and construction $34m)
- Balance of payments to Gading ($54m) are spread over 2023-2026 (at the time Lynas 2025 will start)
- Lynas will not have any responsibility/liability for the WLP once it leaves the LAMP
Over to Yeo...
- will Yeo release all of the US$50 million deposited with AELB?
- is Gading also responsible for transport of the WLP from the LAMP to the PDF or is this cost still with Lynas?
- Forums
- ASX - By Stock
- Ann: PDF for WLP Residue in Malaysia
Hmm..a bit of a mixed bag... The bad news: on-site PDF is off...
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
|
|||||
Last
$6.56 |
Change
0.050(0.77%) |
Mkt cap ! $6.131B |
Open | High | Low | Value | Volume |
$6.51 | $6.59 | $6.49 | $8.348M | 1.273M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 16304 | $6.55 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.56 | 2708 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 6.550 |
1 | 100 | 6.540 |
1 | 10000 | 6.510 |
3 | 5500 | 6.500 |
2 | 5330 | 6.480 |
Price($) | Vol. | No. |
---|---|---|
6.570 | 24700 | 3 |
6.590 | 1193 | 1 |
6.600 | 21366 | 10 |
6.610 | 569 | 1 |
6.630 | 15000 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |