McPhillamys Gold Project - Pre-Feasibility Study
Regis has undertaken studies to a pre-feasibility level into the development of the McPhillamys Gold Project (MGP) in New South Wales. The study assesses the MGP to an appropriate level to support the estimation of a JORC compliant maiden Ore Reserve and to enable the Regis Board to determine the viability of the project so as to commit to workstreams required to complete a Definitive Feasibility Study (DFS) in the December 2017 quarter.
== Life of Mine (LOM) Summary
—>Key life of mine physical results from the study, at a processing throughput of 7Mtpa, are summarised below:
Mining
++ Waste volume (BCM millions). = 91.6
++ Ore volume (BCM millions). = 21.3
++ Volume total (BCM millions) = 112.9
++ W:O Strip Ratio = 4.29
Milling
++ Dry Tonnes Per Hour = 841
++ Plant Availability = 95.0%
++ Ore Milled (Tonnes millions) = 60.1
++ Milled Grade (g/t) = 1.05
++ Recovery = 85.0%
++ Ounces Recovered = 1,728,264
++ Mine life (years) = 9
The capital cost estimate has been developed for the design and construction of a 7.0Mtpa open cut mine and gold processing facility using all new equipment. The MGP capital cost is estimated at $215 million as summarised below.
If the 215 Million Aud is correct the question is how could Regis finance this? They have actually 208 Mio Aud Cash.
Background:
The MGP is wholly owned by Regis and is located approximately 250 kilometres west of Sydney in the Central West region of New South Wales.
In 2017 Regis announced a maiden Ore Reserve Estimate at MGP of 60.1 million tonnes at 1.05g/t Au for 2,034,000 ounces of gold.
Pre-feasibility level studies in 2017 show the MGP is a robust, large scale open pit gold mine with a planned 7 million tonne per annum mining and processing operation producing an average of 192,000 ounces per annum over a ten year mine life.
- Forums
- ASX - By Stock
- Ann: PEA submitted for McPhillamys Gold Project
I found an older announcement from September 2017...
Featured News
Add RRL (ASX) to my watchlist
|
|||||
Last
$1.73 |
Change
-0.185(9.69%) |
Mkt cap ! $1.302B |
Open | High | Low | Value | Volume |
$1.79 | $1.82 | $1.72 | $18.97M | 10.82M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 73866 | $1.73 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.73 | 76752 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 73866 | 1.725 |
17 | 114076 | 1.720 |
8 | 91241 | 1.715 |
8 | 96434 | 1.710 |
7 | 92582 | 1.705 |
Price($) | Vol. | No. |
---|---|---|
1.730 | 76752 | 6 |
1.735 | 93265 | 8 |
1.740 | 105684 | 10 |
1.745 | 89307 | 6 |
1.750 | 78993 | 7 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
RRL (ASX) Chart |