Share
7,030 Posts.
lightbulb Created with Sketch. 2825
clock Created with Sketch.
03/12/24
19:04
Share
Originally posted by plough:
↑
You could probably go through the announcements to get an idea of thickness of the ore bodies , I am guessing it is around 10 meters thick average , Say you want to take out virtually all the ore because of the high grade , then guess you would have to include around 700mm in to the hanging wall country rock and say 400 mm into the foot wall country rock so your 8 meter ore body would be reduced in grade (assuming no hallo effect) by around (0.7 +0.4) / 10 * 100 in % when they bring out a reserve . Be interesting to get the opinion of someone like Craig Jones the COO on the above as I have no mining experience On a narrower vein deposit the dilution would all things being equal be greater
Expand
It’s higher than 10m - if I am right the SPR guys either tild me or it’s was in Simon’s presentation today (verbally) the average is about 16m.