88E 33.3% 0.2¢ 88 energy limited

Ann: Permeability Exceeds Pre-Drill Expectations, page-109

  1. 880 Posts.
    Ryan, not quite correct.

    From the 10/2 announcement "HRZ play further de-risked", note the following points.

    Matrix permeability within the cored HRZ shale exceeds expectations, several times greater than effective cutoff in all 18 core samples measured
    - 2 samples displayed permeability too high to be measured using standard technique (indicating possible presence of "permeability super highways")

    All 18 core samples were several times greater than the cutoff, and 2 were off the chart, so to speak. So even the worst of the results were great, and the good amazing.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(33.3%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $5.997K 2.378M

Buyers (Bids)

No. Vol. Price($)
222 347388030 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 601584897 215
View Market Depth
Last trade - 15.51pm 19/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.